NVIDIA H200 vs B200 prices

Compare mature H200 capacity with newer B200 systems using live public offers and the complete delivered-node specification.

Bottom line

H200 is the maturity and availability baseline. B200 earns its premium when Blackwell performance, 180 GB of memory, higher memory bandwidth, or protected multi-GPU peer traffic produces a measurable workload advantage.

Marketplace data checked 2026-09-08. Specifications vary by form factor and delivered system.

Compare the buying case

Separate marketplace signals for each GPU, followed by the technical differences that affect workload cost.

Hopper

NVIDIA H200

Verified offers20
Price floor$2.51per GPU-hour
Median$3.12per GPU-hour

Choose H200 when 141 GB is sufficient and maturity, current availability, or a lower infrastructure rate outweighs Blackwell uplift.

Review NVIDIA H200 prices
Blackwell

NVIDIA B200

Verified offers9
Price floor$3.50per GPU-hour
Median$5.99per GPU-hour

Choose B200 when benchmarked Blackwell throughput, memory headroom, or protected peer traffic justifies the commercial and deployment premium.

Review NVIDIA B200 prices
Decision factorNVIDIA H200NVIDIA B200
ArchitectureHopperBlackwell
GPU memory141 GB HBM3e180 GB HBM3e
Memory bandwidth4.8 TB/sUp to 8 TB/s
Typical topologyHGX H200 partner systems with 4 or 8 GPUs; H200 NVL options also existHGX B200 systems use 8 GPUs connected through NVLink and NVSwitch
Marketplace availabilityMore established verified supply in the current comparisonNewer supply with fewer verified offers and greater delivery variance
Workload fitLarge-memory Hopper training and inference with a mature software and operating pathHigh-scale training, long-context or large-model inference, and sensitive multi-GPU workloads

Reference specifications: NVIDIA H200 specifications ↗ · NVIDIA HGX platform specifications ↗

Current public offers

Filter the source-linked records by GPU. Prices retain their published region, commitment, and node context.

GPU, provider and nodeRegionTermNormalized priceSource
H200FluidCore8x H200 141GB bare-metal nodeNot publishedhourly$2.51/GPU-hr20.08Provider source ↗Checked 2026-08-23
H200Clore.ai8x H200 Colorado bare-metal nodeColorado, USA360 days$2.59/GPU-hr179020.80Provider source ↗Checked 2026-08-23
H200Leaseweb1x H200 (HP DL385 G11)Londonterm not stated$2.80/GPU-hr£1,503.02/moProvider source ↗Checked 2026-08-20
H200Taiga Cloud8x H200 SXMChester, UKhourly$3.00/GPU-hrFrom $3.00/GPU/hr (bare-metal tier)Provider source ↗Checked 2026-09-04
H200Qubrid AI8x H200 141GB bare-metal serverNot published12 months$3.00/GPU-hr210240.00Provider source ↗Checked 2026-08-23
H200DataPacket8x H200 NVLNot published3–6-mo prepay typ.$3.06/GPU-hr15368Provider source ↗Checked 2026-09-08
H200Gcore8x H200Not publishedhourly$3.17/GPU-hr21.84Provider source ↗Checked 2026-09-04
B200Vultr8x B200 192GB (HGX B200)Not publishedterm not published$3.50/GPU-hr$3.500/GPU/hr (pre-paid contract)Provider source ↗Checked 2026-08-20
B200Qubrid AI8x B200 180GB bare-metal serverNot published12 months$4.25/GPU-hr297840.00Provider source ↗Checked 2026-08-23
H200Hostrunway2x H200 (GPU Montreal 9)Montrealno lock-in$4.45/GPU-hr$6,490/moProvider source ↗Checked 2026-08-20
H200Cirrascale8x H200US1-mo min$4.54/GPU-hr$26,499/mo (annual commit $21,199/mo)Provider source ↗Checked 2026-08-20
H200Hostrunway1x H200 dedicated GPU server (dual EPYC 9224)Montrealno lock-in; 15% discount at 12 months$4.89/GPU-hr3572.00Provider source ↗Checked 2026-08-29
B200Cirrascale8x B200US1-mo min$5.99/GPU-hr$34,999/mo (annual commit $27,999/mo)Provider source ↗Checked 2026-08-20
H200CoreWeave8x H200 bare-metal GPU nodeNorth America / Europeon-demand$6.31/GPU-hr50.44Provider source ↗Checked 2026-08-23
B200CoreWeave8x B200 bare-metal GPU nodeNorth America / Europeon-demand$8.60/GPU-hr68.80Provider source ↗Checked 2026-08-23
H200Oracle Cloud8x H200 (BM.GPU.H200.8)Select OCI regionsno commitment$10.00/GPU-hr$10.00/GPU/hr (pay as you go)Provider source ↗Checked 2026-08-20
B200Oracle Cloud8x B200 (BM.GPU.B200.8)Select OCI regionsno commitment$14.00/GPU-hr$14.00/GPU/hr (pay as you go)Provider source ↗Checked 2026-08-20
B200Tscalebm-b200-8x-blackwellLagos, Nigeria1 monthNot publishedreserved capacity; quote requiredProvider source ↗Checked 2026-08-23
B200Impossible Cloud8x B200 bare-metal nodeEuropean Unionsales quoteNot publishedsales quoteProvider source ↗Checked 2026-08-23
H200OpenMetal1x H200 NVL bare-metal server (starting configuration)Ashburn, Virginiamonthly / sales quoteNot publishedmonthly / sales quoteProvider source ↗Checked 2026-09-08
H200Impossible Cloud8x H200 bare-metal nodeEuropean Unionsales quoteNot publishedsales quoteProvider source ↗Checked 2026-08-23
H200LeaderGPU1x H200 141GB bare-metal serverNetherlands1 dayNot published2986.9Provider source ↗Checked 2026-08-23
H200Massed Compute8x H200 bare-metal cluster nodeNot publishedcustom quoteNot publishedcustom quoteProvider source ↗Checked 2026-08-23
H200DigitalOcean8x HGX H200 141GB SXM5NYC1 / AMS3sales contractNot publishedcontract-basedProvider source ↗Checked 2026-09-08
H200GlassPearl8x H200 whole bare-metal serverNot publishedquote-only fixed whole-server contractNot publishedquote-only fixed whole-server contractProvider source ↗Checked 2026-08-23
H200Sakura InternetKoukaryoku PHY: 8x H200 SXM 141GBIshikari, Japanmonthly / sales consultationNot publishedmonthly / sales consultationProvider source ↗Checked 2026-08-23
B200Sakura InternetKoukaryoku PHY: 8x B200 SXM 180GBIshikari, Japanmonthly / sales consultationNot publishedmonthly / sales consultationProvider source ↗Checked 2026-08-23
H200NAVER Cloud Platform8x H200 141GB bare-metal serverSouth KoreaquoteNot publishedquoteProvider source ↗Checked 2026-08-23
B200GlassPearl8x HGX B200 whole bare-metal serverNot publishedquote-only fixed whole-server contractNot publishedquote-only fixed whole-server contractProvider source ↗Checked 2026-08-23

Balance maturity and performance

H200 has a broader operational history. B200 can offer more performance and memory for supported workloads. Deployment readiness, software compatibility, delivery schedule, and provider experience belong in the decision.

Price the workload outcome

Benchmark representative prompts, sequences, batch sizes, precision, and communication patterns. Compare cost per trained token, generated token, or completed job alongside the infrastructure rate.

Current market signal

Is the premium worth paying?

The current NVIDIA B200 median is 92% above the NVIDIA H200 median in this marketplace dataset.

Pay the B200 premium when the workload can use Blackwell-specific throughput, its larger memory envelope, or its multi-GPU security properties enough to reduce completed-job cost or satisfy a hard requirement. Keep H200 as the baseline when software maturity, supplier choice, and operational familiarity dominate.

The median comparison is descriptive, not a performance benchmark. Configuration, region, and commitment mix can differ between the two offer sets.

Request matching capacity

Send one specification. We will use it to identify matching public and unlisted supply.

Non-binding. By submitting, you agree to the Terms of Use and Privacy Policy.

Questions buyers ask

Is B200 always cheaper per unit of work?

No. It depends on the workload, software maturity, achieved utilization, cluster design, and contract. Benchmark both configurations when the decision is material.